New Westminster Building Permit Data

New Westminster has 5,576 building permits on record, with 513 issued in the last 12 months. The median project value is $75,000 based on permits with declared values. Our dataset has no measured median issue time for New Westminster yet, so this page reports permit volume and value, not wait times.

The dataset shows 513 permits issued in the last 12 months, down 22% year over year. The median project value over the last year was $75,000, representing $160.0M in total declared construction value.

5,576
Permits on record
513
Last 12 months
not measured
Median issue time
$75,000
Median project value

How long do permits take in New Westminster?

New Westminster's open-data feed does not publish application dates, so issue-time medians cannot be computed from the public record. What the data does show is issuance volume: 5,576 permits on file in total, with 513 issued in the past 12 months. May 2025 was the busiest month in the two-year window, with 76 permits issued.

Many Canadian municipalities record only the permit issue date in their public feed, not the date the application was submitted. Without both dates, the elapsed processing time cannot be computed from the public record alone. The dataset for New Westminster is in this category. If you need a processing time estimate for New Westminster, the building department's permit counter is the most reliable source, as staff typically know current queue depth for residential and commercial applications.

If you are planning a project in New Westminster, reviewing the permit history for nearby addresses is the most practical way to calibrate your expectations. You can see what was issued, when, and for what type of work. While this does not tell you how long each permit took, it shows you the volume and mix of recent activity in your neighbourhood, which reflects how familiar the building department is with your project type.

Permit activity trend in New Westminster

New Westminster issued 513 permits in the last 12 months, down from 660 in the prior 12-month window. May 2025 was the busiest month in the two-year window, with 76 permits issued. Permit volume varies by season and by the number of large projects entering the pipeline; a single major development can shift monthly totals significantly, so month-over-month figures are best read as a direction indicator, not a precise forecast.

What gets built in New Westminster?

The top permit categories in New Westminster show where construction activity is concentrated. The counts reflect the last 12 months of available data.

PLUMBING PERMITS43% of total

PLUMBING PERMITS is the single largest category in New Westminster, accounting for 43% of permits (222 in the last 12 months).

ALTERATION20% of total

ALTERATION permits make up 20% of New Westminster's permit mix, with 103 in the last 12 months.

COM - TEN14% of total

COM - TEN accounts for 14% of New Westminster's permits, with 71 in the last 12 months.

ACTIVE4% of total

ACTIVE represents 4% of New Westminster's permits at 19 in the last 12 months.

HYDRONIC HEATING2% of total

HYDRONIC HEATING represents 2% of New Westminster's permits at 12 in the last 12 months.

Reading the data before you apply

Permit data works best as a reference range rather than a precise forecast. Without a published application-to-issue timeline for New Westminster, the most useful reference points are permit counts by type and by month, which show how active the pipeline is and what categories of work are moving through the review queue. A neighbourhood with a high volume of recent permits often signals an active building department that is familiar with the most common project types in that area. Checking the permit history for nearby addresses gives you a real-world baseline calibrated to your specific neighbourhood and project type.

Distributions tell you more than averages when you are building a project timeline. Even where median data is not available, it is worth asking your contractor or permit expediter what timelines they have seen for comparable projects in New Westminster recently, since their practical experience often reflects current processing capacity better than historical averages. Permit fees, contractor availability, inspection scheduling, and any required engineering or heritage reviews all add time on top of the permit issue date itself.

The permit history lookup below lets you see every permit on record for any New Westminster address, including permit type, declared project value, and issue dates. If a property has had previous permits, that record tells you what the building department has already reviewed and approved for that parcel, which can simplify the scope discussion on a new application. If there are no prior permits, that is also useful to know before you begin. The lookup is free, and the full permit history report for any address is available if you need the complete record for due diligence or renovation planning.

Check a New Westminster permit for free

See every permit on record for any New Westminster address, free. The full history report is $29 if you want it.

Frequently asked questions

How many building permits are issued in New Westminster?

5,576 building permits are on record for New Westminster in the Van Permit Audit dataset, with 513 in the last 12 months.

What is the typical project value of a New Westminster building permit?

The median declared project value is $75,000.

Permit cost benchmarks

Related guides

Check a New Westminster permit for free

See every permit on record for any New Westminster address, free. The full history report is $29 if you want it.

Source: Van Permit Audit national permit dataset, aggregated from official municipal open-data sources. Median issue times reflect 2018 to 2025 issued permits; permit-volume coverage windows vary by city. Citation: "Source: Van Permit Audit (vanpermitaudit.ca)."