Surrey Building Permit Data

Surrey has 8,969 building permits on record in our dataset, with 2,658 issued in the last 12 months. The City's official target is 10 weeks for residential permits. The City's own dashboard, checked August 22, 2026, shows the current average running faster, at 4.1 weeks.

The dataset shows 2,658 permits issued in the last 12 months, up 19% year over year. The median project value over the last year was $194,375, representing $6.6B in total declared construction value.

8,969
Permits on record
2,658
Last 12 months
not measured
Median issue time
$150,000
Median project value

How long do permits take in Surrey?

Surrey's open-data feed does not publish application dates, so issue-time medians cannot be computed from the public record. What the data does show is issuance volume: 8,969 permits on file in total, with 2,658 issued in the past 12 months. March 2026 was the busiest month in the two-year window, with 477 permits issued.

Many Canadian municipalities record only the permit issue date in their public feed, not the date the application was submitted. Without both dates, the elapsed processing time cannot be computed from the public record alone. The dataset for Surrey is in this category. If you need a processing time estimate for Surrey, the building department's permit counter is the most reliable source, as staff typically know current queue depth for residential and commercial applications.

Surrey's own published processing target is 10 weeks (Building Permit: Residential (new single-family and duplex)), according to City of Surrey. Since the open-data feed does not record application dates, this figure cannot be independently verified against permit-level data, but it gives you a published baseline to reference when planning a project timeline.

If you are planning a project in Surrey, reviewing the permit history for nearby addresses is the most practical way to calibrate your expectations. You can see what was issued, when, and for what type of work. While this does not tell you how long each permit took, it shows you the volume and mix of recent activity in your neighbourhood, which reflects how familiar the building department is with your project type.

Permit activity trend in Surrey

Surrey issued 2,658 permits in the last 12 months, up from 2,229 in the prior 12-month window. March 2026 was the busiest month in the two-year window, with 477 permits issued. Permit volume varies by season and by the number of large projects entering the pipeline; a single major development can shift monthly totals significantly, so month-over-month figures are best read as a direction indicator, not a precise forecast.

What gets built in Surrey?

The top permit categories in Surrey show where construction activity is concentrated. The counts reflect the last 12 months of available data.

Unspecified33% of total

Unspecified is the single largest category in Surrey, accounting for 33% of permits (886 in the last 12 months).

Miscellaneous Residential Permits10% of total

Miscellaneous Residential Permits accounts for 10% of Surrey's permits, with 273 in the last 12 months.

Misc Commercials10% of total

Misc Commercials accounts for 10% of Surrey's permits, with 260 in the last 12 months.

Demolition9% of total

Demolition accounts for 9% of Surrey's permits, with 238 in the last 12 months.

New Single Family with Secondary Suite6% of total

New Single Family with Secondary Suite accounts for 6% of Surrey's permits, with 165 in the last 12 months.

Reading the data before you apply

Permit data works best as a reference range rather than a precise forecast. Without a published application-to-issue timeline for Surrey, the most useful reference points are permit counts by type and by month, which show how active the pipeline is and what categories of work are moving through the review queue. A neighbourhood with a high volume of recent permits often signals an active building department that is familiar with the most common project types in that area. Checking the permit history for nearby addresses gives you a real-world baseline calibrated to your specific neighbourhood and project type.

Distributions tell you more than averages when you are building a project timeline. Even where median data is not available, it is worth asking your contractor or permit expediter what timelines they have seen for comparable projects in Surrey recently, since their practical experience often reflects current processing capacity better than historical averages. Permit fees, contractor availability, inspection scheduling, and any required engineering or heritage reviews all add time on top of the permit issue date itself.

The permit history lookup below lets you see every permit on record for any Surrey address, including permit type, declared project value, and issue dates. If a property has had previous permits, that record tells you what the building department has already reviewed and approved for that parcel, which can simplify the scope discussion on a new application. If there are no prior permits, that is also useful to know before you begin. The lookup is free, and the full permit history report for any address is available if you need the complete record for due diligence or renovation planning.

Check a Surrey permit for free

See every permit on record for any Surrey address, free. The full history report is $29 if you want it.

Frequently asked questions

How many building permits are issued in Surrey?

8,969 building permits are on record for Surrey in the Van Permit Audit dataset, with 2,658 in the last 12 months.

What is the typical project value of a Surrey building permit?

The median declared project value is $150,000.

Permit cost benchmarks

Related guides

Check a Surrey permit for free

See every permit on record for any Surrey address, free. The full history report is $29 if you want it.

Source: Van Permit Audit national permit dataset, aggregated from official municipal open-data sources. Median issue times reflect 2018 to 2025 issued permits; permit-volume coverage windows vary by city. Citation: "Source: Van Permit Audit (vanpermitaudit.ca)."