North Saanich is one of the municipalities our bylaw library covers in full, so this checklist is built from the District’s own documents: Zoning and Development Bylaw No. 1255, Building and Plumbing Bylaw No. 1150, and the District’s Building Permit Application Information package. Everything below is quoted or measured from those three.
Work through it in order. The zoning conditions come first, because they decide whether a suite is possible at all. The building permit documents come second.
What counts as a secondary suite in North Saanich
Bylaw 1255 defines a secondary suite as “a self-contained dwelling unit, with no more than two bedrooms, located entirely within but clearly accessory to a single family residential dwelling,” with the suite and the dwelling remaining a single property.
Three things follow from that wording. The suite has to be inside the house, not a separate building. It is capped at two bedrooms by definition, before any size rule applies. And a carriage house, a guest cottage or a laneway house is a different use with its own section of the bylaw, not a secondary suite.
Submitting a permit application?
The Permit Compliance Audit checks your plans against zoning, building, and parking bylaws before you submit, so you catch the issues that trigger a resubmission cycle while they still cost nothing to fix. Free analysis first, $149 CAD one-time for the certified report.
See the Permit Compliance Audit, $149 CADThe Section 206 conditions
Bylaw 1255 s. 206.1 lists conditions that must all be satisfied. In plain terms:
Your zone has to allow it. The lot must sit in a zone where Division 500 of the bylaw expressly permits secondary suites. Division 500 is the permitted-use list for each zone, so look up your own zone there rather than assuming.
One house, one suite. The lot must not contain more than one single family residential dwelling, and must not already have another secondary suite, laneway house, carriage house, guest cottage or caretaker’s cottage, or any dwelling unit other than the principal one. It also must not have more than one room used for boarding and lodging.
The size cap is a “lesser of” test. Section 206.1.2 caps the gross floor area of the suite at the lesser of two numbers: 60 m2 (649 ft2) in the CD-3 or CD-4 zone and 90 m2 (970 ft2) in any other zone, and 40 percent of the habitable area of the house the suite sits in.
That second half is the one people miss. On a modest house, the 40 percent test binds long before the 90 m2 ceiling does. A house with 150 m2 of habitable area allows a suite of 60 m2, not 90.
Sewer or an approved septic system. The house must be connected to the District’s sanitary sewer system, or be served by an on-site sewage disposal system that complies with the Public Health Act.
No stratifying. A house containing a secondary suite must not be subdivided under the Strata Property Act or otherwise.
Parking: the suite adds a third space
Section 206.1.4 requires one additional off-street parking space, on the lot, for the exclusive use of the suite’s occupants, provided in accordance with Division 300.
The off-street parking table in s. 306.1 sets the base at 2 spaces for single family residential, with a secondary suite adding 1 more. So a house with a suite needs 3 off-street spaces, and the suite’s space cannot be a shared or tandem afterthought if the bylaw’s exclusive-use wording is to be met. Measure this on the site plan early. On a narrow lot it is a real constraint, not a formality.
Check a Vancouver permit for free
See every permit on record for any Vancouver address, free. The full history report is $29 if you want it.
Check a Vancouver permit, freeDo you need a building permit for the work?
Yes, for essentially any suite build-out. The District’s application package lists these among the triggers for a permit: completing a previously unfinished area in an existing building, removing, relocating, altering or constructing interior walls, and making plumbing additions or alterations. A suite normally does all three.
The package also carries a warning worth reading twice: “Failure to acquire a permit BEFORE starting will result in a double fee.”
The documents the counter asks for
From the District’s application package, the items to have ready at application:
- The completed building permit application form, which includes its own checklist of required drawings and what each must show
- One set of the site plan
- One set of the construction drawings
- A recent certificate of title, not more than 30 days old, including copies of all charges (covenants, easements and statutory rights of way)
- Schedule “C”, Owners Acknowledgement, from Bylaw 1150, which the package describes as required for all building permit applications
- Engineering Schedule B from the BC Building Code for any manufactured products such as trusses, I joists or manufactured beams
- Schedule “A” from the BC Building Code if more than one professional is involved
- Schedule “D” from Bylaw 1150, a registered professional’s proof of insurance, where letters of assurance are required
- Homeowner Protection Office approval, or owner builder approval, for new residential construction
- Vancouver Island Health Authority septic approval where the property is not on sewer, which the package says is required for new residences and for renovations that increase the number of plumbing fixtures
- The plan processing fee, set in s. 5.9 of Bylaw 1150
The energy side is set out in the District’s BC Energy and Zero Carbon Step Codes handout, which applies Step Level 3 in North Saanich, with guest cottages excepted. Ask the building department how that lands on your specific scope, because a suite inside an existing house is a different case from a new build.
What happens after you submit
The package states that applications will not be accepted until all the information is provided, and that incomplete servicing submissions will not be reviewed at all: staff notify the applicant to revise and resubmit.
Once an application is accepted, the District says a review typically takes about three weeks, and names what moves that number: the volume of applications, the complexity of the project, the accuracy of the application, whether a development variance permit, covenant or rezoning is needed, and whether the plans comply with the zoning and other bylaws including the BC Building Code. It also notes that during peak construction periods the estimate may be exceeded.
Note what sits on that list. Accuracy and compliance of your own package are two of the five factors, and they are the two you control.
Frequently asked questions
How big can a North Saanich secondary suite be?
The lesser of two numbers: 90 m2 (970 ft2) in most zones, or 60 m2 (649 ft2) in the CD-3 and CD-4 zones, and 40 percent of the habitable area of the house. On most houses the 40 percent test is the binding one.
Can I put the suite in a detached building?
Not as a secondary suite. Bylaw 1255 defines a secondary suite as being located entirely within the single family dwelling. A detached unit falls under a different use, such as a carriage house or guest cottage, with its own conditions.
How much parking do I need?
Three off-street spaces: two for the single family residential use under s. 306.1, plus one more for the suite’s exclusive use under s. 206.1.4.
Can I sell the suite separately later?
No. Section 206.1.5 says a house containing a secondary suite must not be subdivided under the Strata Property Act or otherwise.
Before you hand the package in, it is worth checking it against the bylaw line by line. That is what a Permit Readiness Review does, and the first-pass analysis is free. If you want the wider picture of what gets applications returned, read why BC permit applications get sent back.