A permit lead feed is a weekly list of the building permits filed in one city, filtered to one trade. Every row is a real project with a real address, because somebody paid a fee and filed paperwork to do it. That is the appeal: it is a list of work that is going to happen, rather than a list of people who might be interested.
It is also a list that is easy to misread. This post walks through what a row contains, which column decides whether the lead is early or late, and the volumes a trade should actually expect in a week.
What one row contains
A feed row has nine fields:
- address of the project
- municipality
- permit_type, the city’s own classification of the work
- description, the city’s text for what is being done
- applicant and contractor, as the municipality publishes them
- filed_date
- value_cad, the declared construction value
- permit_number
Two of those nine do most of the qualifying work. The description tells you whether the job is yours: “interior alterations to provide a secondary suite” and “exterior alterations only to install 10 flush mounted solar panels” are both alteration permits and nothing alike. The declared value tells you the scale. A $13,000 permit and a $4,500,000 permit need different phone calls, and sorting on value before you start dialling is the single highest-return habit.
The contractor field is the other one to read carefully. A row with a contractor already named is a different situation from a row without one. Both can be worth a call, but they are not the same call.
Submitting a permit application?
The Permit Compliance Audit checks your plans against zoning, building, and parking bylaws before you submit, so you catch the issues that trigger a resubmission cycle while they still cost nothing to fix. Free analysis first, $149 CAD one-time for the certified report.
See the Permit Compliance Audit, $149 CADThe date column decides whether you are early
This is the part that separates a useful feed from a late one.
Municipal permit data usually carries two dates: when the permit record was created, and when the permit was issued. A feed keyed on the created date surfaces a project while it is still in review. A feed keyed on the issued date surfaces it once the city has signed off, which is weeks or months later.
How many weeks? In Vancouver, across 6,730 permits over a trailing 12 month window (snapshot 2026-08-24), the median time from application to issuance was 65 days. For new buildings it was 173 days. That is the size of the window between the two dates.
Our feed uses the permit-number created date where the city publishes one, and falls back to the issue date where it does not. So the honest answer about how early a feed is: it depends on what the municipality publishes, and the city with the richer feed gives you the earlier lead. When you evaluate any permit feed, including this one, ask which date it keys on. If the answer is the issue date only, the work may already be underway.
Realistic weekly volume by trade and city
Volume varies enormously by trade and city, and expectations set from the biggest market will disappoint everywhere else. These are permits per week in our dataset, snapshot 2026-07-09 with data through 2026-05-15:
| Trade and city | Permits per week | Per month |
|---|---|---|
| Renovation, Vancouver | 52.7 | 226 |
| New construction, Vancouver | 21.0 | 90 |
| ADU and secondary suite, Vancouver | 13.7 | 59 |
| ADU and secondary suite, Surrey | 12.9 | 55 |
| New construction, Surrey | 12.8 | 55 |
| Renovation, Victoria | 9.3 | 40 |
| Solar and heat pump, Vancouver | 6.9 | 30 |
| Roofing, Vancouver | 5.6 | 24 |
| Renovation, Burnaby | 2.1 | 9 |
Read the bottom of that table as carefully as the top. Renovation in Burnaby is about 9 permits a month. That is not a prospecting pipeline you can live on, and no feed can create permits that were not filed. For the thinner combinations the sensible setup is a monthly list rather than a weekly one, and a second city.
The flip side: renovation in Vancouver is roughly 53 rows a week. Nobody calls 53 projects a week. Which brings us to triage.
Check a Vancouver permit for free
See every permit on record for any Vancouver address, free. The full history report is $29 if you want it.
Check a Vancouver permit, freeHow to work a feed without drowning in it
A workable weekly routine:
- Sort by declared value, descending. Decide your floor and ignore everything under it.
- Read the descriptions, not the permit types. The type is a bucket. The description is the job.
- Split by whether a contractor is named. Those are two different scripts.
- Keep the permit number with every lead. It is the reference the city and the owner both recognise, and it stops you double-working the same project next week.
- Expect the same project to appear more than once across a run of weeks if it gets revised. Dedupe on permit number, not address.
Ten properly qualified calls out of 53 rows beats 53 rushed ones, and the sorting takes about fifteen minutes.
What a permit feed cannot tell you
It is not an approval rate. Permit data has no approval or denial field. It tells you what was filed or issued, nothing about refusals.
It is not a verified phone number. A feed gives you an address, a permit and a description. Contact details are work you do.
It is not every project. Plenty of work needs no permit, and the municipality has to publish its records for them to appear at all. Address-level permit data exists for 32 Canadian municipalities in our warehouse; outside those there is nothing to feed.
It is not exclusive. These are public records. Anyone can read the same dataset. Your advantage is speed and the quality of the call, not access.
What it costs, and how to test it
The Permit Lead Feed is $97 CAD per month for one trade in one city, delivered weekly as a spreadsheet attachment, with a 14 day free trial. The trades set up as standard are renovation and addition, new construction, ADU and secondary suite, solar and heat pump, and roofing; other trades are matched against the permit type, category and description text.
The way to test any feed, this one included, is to take one week of rows and work them properly. If 53 rows of Vancouver renovation permits produce no conversation worth having, more rows will not fix that, and you have learned something cheap.
If you are on the other side of this, submitting a permit rather than chasing one, our breakdown of how long a building permit takes in Metro Vancouver explains the gap between filing and issuance that makes these feeds possible. All current prices are on the pricing page.
Frequently asked questions
How is this different from looking up permits myself?
It is the same public data. Vancouver publishes its issued building permits through the City’s open data portal and you can search it directly. A feed filters one city to one trade and arrives on a schedule, which is a time saving, not an information advantage.
How early in the project are these leads?
That depends on the date the municipality publishes. Where a city publishes the date the permit record was created, the lead appears while the permit is still in review. In Vancouver the median gap between application and issuance was 65 days, so that window can be substantial.
Why is my city’s list so short?
Because that many permits were filed. Thinner trade and city combinations, such as renovation in Burnaby at around 9 permits a month, are genuinely small. Adding a nearby city usually helps more than switching feeds.
Do the leads include phone numbers?
No. Each row carries the address, municipality, permit type and description, applicant and contractor as published, the filed date, declared value and permit number. Finding the right person to speak to is your step.