Burnaby, BC
Building permit help in Burnaby: catch the by-law rejections before you submit
Burnaby consolidated most of its single-family land into the R1 SSMUH District in response to Bill 44, which changed what you can build on a standard lot overnight. Permit packages drawn against the old R-zone rules are one of the most common reasons a Burnaby application comes back for correction.
Free analysis · $149 one-time for the certified PDF · No account required to try
Why permits get rejected in Burnaby
Most Burnaby permit delays are not design problems, they are compliance gaps the city plan-checker catches that the applicant could have caught first. Van Permit Audit reads your drawings against Burnaby R1 SSMUH District zoning, secondary-suite regulations, and Building By-law 13658C. and flags the deficits line by line, with a citation to the exact by-law clause, before you ever hit submit.
Common rejection reasons in Burnaby
- •Drawings that reference an old R-zone instead of the current R1 SSMUH District.
- •Unit count or floor area above the R1 SSMUH allowance.
- •Secondary-suite egress, fire-separation, or ceiling-height gaps.
- •Rear-yard accessory-building footprint or height over the permitted limit.
Burnaby and the SSMUH (Bill 44) rules
BC's Small-Scale Multi-Unit Housing legislation (Bill 44, in force since 2024) forced every municipality, Burnaby included, to allow more units on lots that used to be single-family. That is good news for builders, but it means the rules changed recently and the two layers, the old zoning and the new SSMUH allowances, often contradict each other on paper. A pre-check that reads against Burnaby's current by-laws is the fastest way to be sure your drawings match the version the plan-checker is using.
How the Burnaby pre-check works
- 1
Upload your permit drawings
Drag in the PDF of your Burnaby permit set. No account required to run the first analysis.
- 2
The engine reads it against the by-laws
Each value in your drawings, setbacks, FSR or floor area, height, lot coverage, parking, unit count, is reconciled against the specific Burnaby by-law clause that governs it.
- 3
You get a line-by-line report
Every check is graded Pass, Warning, or Fail, with a confidence score and a direct citation. Fix the warnings before you submit, not after the city sends it back.
Van Permit Audit is a preliminary screening tool, not a replacement for a licensed architect or P.Eng. Final permit drawings must still be reviewed and stamped by a qualified professional before submission to Burnaby.
