North Vancouver, BC
Building permit help in North Vancouver: catch the by-law rejections before you submit
North Vancouver is two municipalities, the District and the City, each with its own zoning and SSMUH by-law, and much of the land is on the slope of the North Shore mountains. Applying the wrong municipality's rules, or missing the steep-slope and creek-setback requirements, is the most common reason a North Shore permit is sent back.
Free analysis · $149 one-time for the certified PDF · No account required to try
Why permits get rejected in North Vancouver
Most North Vancouver permit delays are not design problems, they are compliance gaps the city plan-checker catches that the applicant could have caught first. Van Permit Audit reads your drawings against District of North Vancouver Zoning By-law 3210 and SSMUH By-law 8696 (and City of North Vancouver Zoning By-law 6700 / SSMUH By-law 9137), secondary-suite regulations, and the applicable construction by-law. and flags the deficits line by line, with a citation to the exact by-law clause, before you ever hit submit.
Common rejection reasons in North Vancouver
- •Using City rules on a District property (or vice-versa), they are separate jurisdictions.
- •Steep-slope, geotechnical, or creek-setback requirements missed on sloped lots.
- •Coach-house or secondary-suite egress and separation gaps.
- •SSMUH unit count or lot coverage over the allowance.
North Vancouver and the SSMUH (Bill 44) rules
BC's Small-Scale Multi-Unit Housing legislation (Bill 44, in force since 2024) forced every municipality, North Vancouver included, to allow more units on lots that used to be single-family. That is good news for builders, but it means the rules changed recently and the two layers, the old zoning and the new SSMUH allowances, often contradict each other on paper. A pre-check that reads against North Vancouver's current by-laws is the fastest way to be sure your drawings match the version the plan-checker is using.
How the North Vancouver pre-check works
- 1
Upload your permit drawings
Drag in the PDF of your North Vancouver permit set. No account required to run the first analysis.
- 2
The engine reads it against the by-laws
Each value in your drawings, setbacks, FSR or floor area, height, lot coverage, parking, unit count, is reconciled against the specific North Vancouver by-law clause that governs it.
- 3
You get a line-by-line report
Every check is graded Pass, Warning, or Fail, with a confidence score and a direct citation. Fix the warnings before you submit, not after the city sends it back.
Van Permit Audit is a preliminary screening tool, not a replacement for a licensed architect or P.Eng. Final permit drawings must still be reviewed and stamped by a qualified professional before submission to North Vancouver.
