Building permit help in Richmond: catch the by-law rejections before you submit
Richmond layers SSMUH small-scale multi-unit zones on top of Zoning By-law 8500, and much of the city sits on flood-construction-level land that adds an elevation requirement most other municipalities do not have. Both are routine trip-ups on a first submission.
Free analysis · $149 one-time for the certified PDF · No account required to try
Why permits get rejected in Richmond
Most Richmond permit delays are not design problems, they are compliance gaps the city plan-checker catches that the applicant could have caught first. Van Permit Audit reads your drawings against Richmond Zoning By-law 8500 (including SSMUH zones), secondary-suite regulations, and Building Regulation By-law 7230. and flags the deficits line by line, with a citation to the exact by-law clause, before you ever hit submit.
Common rejection reasons in Richmond
- •Finished-floor elevation below the required flood-construction level.
- •Mixing legacy single-family zoning with the new SSMUH unit allowances.
- •Setback, lot-coverage, or height deficits on infill projects.
- •Secondary-suite egress and fire-separation gaps.
Richmond and the SSMUH (Bill 44) rules
BC's Small-Scale Multi-Unit Housing legislation (Bill 44, in force since 2024) forced every municipality, Richmond included, to allow more units on lots that used to be single-family. That is good news for builders, but it means the rules changed recently and the two layers, the old zoning and the new SSMUH allowances, often contradict each other on paper. A pre-check that reads against Richmond's current by-laws is the fastest way to be sure your drawings match the version the plan-checker is using.
How the Richmond pre-check works
- 1
Upload your permit drawings
Drag in the PDF of your Richmond permit set. No account required to run the first analysis.
- 2
The engine reads it against the by-laws
Each value in your drawings, setbacks, FSR or floor area, height, lot coverage, parking, unit count, is reconciled against the specific Richmond by-law clause that governs it.
- 3
You get a line-by-line report
Every check is graded Pass, Warning, or Fail, with a confidence score and a direct citation. Fix the warnings before you submit, not after the city sends it back.
Van Permit Audit is a preliminary screening tool, not a replacement for a licensed architect or P.Eng. Final permit drawings must still be reviewed and stamped by a qualified professional before submission to Richmond.