Surrey, BC
Building permit help in Surrey: catch the by-law rejections before you submit
Surrey is BC's fastest-growing city and one of the busiest permit counters in the province. The 2023 provincial SSMUH legislation (Bill 44) added new small-scale multi-unit zones to By-law 12000, and applications that mix the old single-family rules with the new SSMUH allowances are a frequent source of plan-check revisions.
Free analysis · $149 one-time for the certified PDF · No account required to try
Why permits get rejected in Surrey
Most Surrey permit delays are not design problems, they are compliance gaps the city plan-checker catches that the applicant could have caught first. Van Permit Audit reads your drawings against Surrey Zoning By-law 12000 (including the new SSMUH zones under Bill 44), secondary-suite regulations, and Building By-law 17850. and flags the deficits line by line, with a citation to the exact by-law clause, before you ever hit submit.
Common rejection reasons in Surrey
- •Confusing the pre-Bill-44 single-family zoning with the new SSMUH unit-count and lot-coverage allowances.
- •Secondary-suite designs that miss separate-egress or ceiling-height requirements.
- •Setback and lot-coverage deficits on infill lots.
- •Parking counts that do not match the permitted number of dwelling units.
Surrey and the SSMUH (Bill 44) rules
BC's Small-Scale Multi-Unit Housing legislation (Bill 44, in force since 2024) forced every municipality, Surrey included, to allow more units on lots that used to be single-family. That is good news for builders, but it means the rules changed recently and the two layers, the old zoning and the new SSMUH allowances, often contradict each other on paper. A pre-check that reads against Surrey's current by-laws is the fastest way to be sure your drawings match the version the plan-checker is using.
How the Surrey pre-check works
- 1
Upload your permit drawings
Drag in the PDF of your Surrey permit set. No account required to run the first analysis.
- 2
The engine reads it against the by-laws
Each value in your drawings, setbacks, FSR or floor area, height, lot coverage, parking, unit count, is reconciled against the specific Surrey by-law clause that governs it.
- 3
You get a line-by-line report
Every check is graded Pass, Warning, or Fail, with a confidence score and a direct citation. Fix the warnings before you submit, not after the city sends it back.
Van Permit Audit is a preliminary screening tool, not a replacement for a licensed architect or P.Eng. Final permit drawings must still be reviewed and stamped by a qualified professional before submission to Surrey.
